- Design . Construction . Project Management Brampton . GTA
Residential Permit
Zoning and Site verification, Detailed design and drawings, Building Permit, Construction, Home Renovation, Addition and Alteration(Includes Interior renovations, Decks, Garages etc.)
Residential Permit
New Residential Permit and design steps:
- Zoning and Site verification
- Detailed design and drawings
- Building Permit
- Construction
- Home Renovation, Addition and Alteration(Includes Interior renovations, Decks, Garages etc.)
Renovation steps:
- Zoning and Site verification
- Detailed design and drawings
- Building Permit
- Construction



Above grade Side Entrance
Above grade side entrance is created by opening a new door in side wall. Door has to be minimum 4’0″ from owner’s side property line.
Below Grade Entrance
Below grade entrance may be in rear yard or side yard provided side yard width is adequate. It should have few steps going down and at bottom a new door opening in exterior wall of basement.